Shopping Cart -

$0.00 (0 item)

You have no items in your shopping cart.

Subtotal: $0.00

 

Weldona, Colorado 970-368-4455

DieselOrings is a small, family owned and operated business located in the sparsely populated plains of Northeastern Colorado.
UPS is delivering orders in a reasonable time compared to what we see with USPS.
Please understand that these delays are out of our control.
  3/26/2020 - UPS has suspended Guaranteed Delivery for Next Day Air, 2nd Day Air, 3 Day Select and Ground.
UPS has denied all claims for missed delivery dates. (LINK)

 

AE injector

More Views

#11-004 Alliant 7.3L Injector 1999-2003 AE Long Lead

Be the first to review this product

$234.67

Availability: In stock

Only 2 left

HEUI Injector for the 1999-2003 7.3L diesel.

* Required Fields

$234.67

 

Brand New OEM HEUI 7.3L Injector AE Long Lead

 

New HEUI Injector for the 1999-2003 7.3L diesel. Normally only used in Cylinder #8


A Core charge of $100 applies to each injector. Refunds for Core Deposits that have been paid via PayPal will be refunded with a Bank Check mailed USPS Priority Mail to the billing address on the original order. PayPal recently changed their refund policy and are now now charging 2.9% on all refunds. If you prefer to have your refund credited to your original PayPal payment, e-mail us and we will withhold the 2.9% PayPal fee from your total refund. Refunds for Core Deposits paid via Credit Card will be refunded to the original charged credit card with no fees.

Please call 970-368-4455 for RMA for Core Returns
Click here for our INJECTOR CORE RETURN POLICY
 
New OEM HEUI injectors exclusively through Alliant Power!
 
What does it fit?  Long Lead Injector.  Engines built AFTER 12/07/1998. Used in #8 cylinder to eliminate "cackle"
  • 1999-2003 F Series ESN Range: 661,496 to 896,812
  • 1999-2003 E Series ESN Range: 661,974 to 896,812
Includes a 24-month, unlimited mileage warranty! *Ford applications only

Alliant AP63804AE Injector
 
Item #11-004
Ref# F81Z9E527EARM , XC3Z9E527AARM , 5C3Z9VE527ARM
Orders Over $99 with *Free Shipping on US orders ships via US Postal Mail including Hawaii, Alaska and PR. Weight restrictions apply to Hawaii, Alaska and PR
*Free Shipping on large and/or heavy orders ships via UPS and only applies to orders to addresses within the Continental US (excluding Alaska).
UPS shipments outside the Continental US will incur additional charges.